Variable Frequency Drives and PA Tier II AECs: What Every Motor User Needs to Know
Variable frequency drives on pumps, fans, and compressors qualify for PA Tier II AECs. Here's how VFD projects are measured, what they're worth, and how to register.
Insights & Resources
Guides, case studies, and policy analysis on Pennsylvania Tier II AECs, CHP, and utility rebate strategy for commercial buildings.
6 articles
Browse the complete article index
Variable frequency drives on pumps, fans, and compressors qualify for PA Tier II AECs. Here's how VFD projects are measured, what they're worth, and how to register.
Pennsylvania manufacturers with compressed air upgrades, motor efficiency projects, and process improvements qualify for PA Tier II AECs. Revenue guide and registration walkthrough.
When a facility implements LED, HVAC, and VFD upgrades simultaneously, how do you attribute savings to each measure? Submetering strategies provide the answer — and unlock maximum AEC value.
Compressed air is typically 20 to 30 percent of an industrial facility's electricity load, and a quarter to a third of it is wasted. This model works through what a system upgrade would save and what those savings produce in Tier II AECs.
From LED lighting to variable frequency drives, dozens of energy efficiency measures qualify under PA Act 129 and the AEPS. Discover the full list of eligible technologies and documentation requirements.
A 200,000 sq ft warehouse retrofitting 1,200 metal halide fixtures and adding VFDs to dock ventilation would save roughly 2,650 MWh annually — here is what that is worth in Tier II AECs, with the arithmetic shown.
Not ready to submit a project?
Reference material for facilities in research mode, and market intelligence for anyone who wants to know when PA Tier II AEC pricing moves.
One page. What § 75.62 / § 75.63 require, the documentation PennAEPS asks for, meter-placement questions to settle before an application, and the attribute-ownership contract review. Request a copy from our team.
One email. Unsubscribe any time.
Current PA Tier II AEC pricing, ACP position, PRESS Act status, regulatory developments worth tracking. Sent when pricing moves outside a stated band or a material regulatory event occurs. Not a marketing list.
One email. Unsubscribe any time.