CHP & PA Tier II AECs

    CHP and PA Tier II AECs

    Combined Heat and Power (CHP) systems may qualify for PA Tier II Alternative Energy Credits under one of two eligibility pathways, depending on system size.

    Distributed Generation

    CHP systems under 5 MW nameplate capacity

    CHP systems below the 5 MW threshold may qualify as distributed generation under PA Tier II. AEC issuance is based on metered electrical output of the CHP system.

    Demand-Side Management

    CHP systems 5 MW or greater

    Larger CHP systems may qualify as a Demand-Side Management (DSM) measure. Onsite generation that displaces grid electricity consumption is characterized as a demand-side load reduction.

    Timing and issuance

    Under both pathways, PA Tier II AECs are issued forward from the date a complete PennAEPS application — including a meter or inverter reading — is filed with the administrator, under 52 Pa. Code § 75.63(i). AEC eligibility, sizing, and calculation depend on your specific system's certification pathway, fuel source, and operational profile. Because these details are project-specific, we recommend a direct eligibility review.

    AEC Revenue Calculator

    What is your CHP system worth in Tier II AECs?

    Nameplate, hours, and realistic capacity factor. AEC volume equals metered MWh at 1:1 (or MWh conserved for systems 5 MW and above, evaluated as DSM).

    Continuous baseload ≈ 8,760. Practical ceiling ≈ 8,400.

    Baseload industrial 85–95%, hospital 75–90%, thermal-following 40–60%.

    RY2025 weighted average $26.92; RY2025 spot average $36.43. Different measures — not interchangeable.

    Annual AECs

    13.6k

    Annual revenue

    $366.1k

    Monthly cost of delay

    $30.5k

    10-year revenue

    $3.66M

    Modeled estimate. Actual AEC issuance begins at the complete application filing and depends on PennAEPS qualification, meter placement, capacity factor realized, and contract-assigned attribute ownership. We review these before an application goes in.

    Interested in evaluating your CHP system for PA Tier II AEC eligibility?

    Not ready to submit a project?

    Two lower-commitment ways to stay useful

    Reference material for facilities in research mode, and market intelligence for anyone who wants to know when PA Tier II AEC pricing moves.

    PA Tier II AEC eligibility checklist

    One page. What § 75.62 / § 75.63 require, the documentation PennAEPS asks for, meter-placement questions to settle before an application, and the attribute-ownership contract review. We email it as a PDF.

    One email. Unsubscribe any time.

    Quarterly market update

    Current PA Tier II AEC pricing, ACP position, PRESS Act status, regulatory developments worth tracking. Sent when pricing moves outside a stated band or a material regulatory event occurs. Not a marketing list.

    One email. Unsubscribe any time.

    Eligibility, documentation, and revenue analysis for combined heat and power under PA Tier II.

    Browse the full library in the PA Tier II AEC insights index.