Eligibility

    New Buildings That Beat Energy Code Can Earn PA Credits

    Oct 18, 2026Updated 18 Oct 20267 min read
    Share

    Most Pennsylvania building owners who have heard of Alternative Energy Credits think of them as something you claim after replacing old equipment. The credits are calculated from energy savings, and savings imply something that used to be there.

    That is the common case, not the rule. Pennsylvania’s Technical Reference Manual — the Public Utility Commission manual that defines how energy savings are measured in this state — treats new construction as its own measure category, with its own baseline. For a new building, the baseline is not old equipment. It is the building the energy code would have allowed. Everything the design delivers beyond that is measurable savings.

    For a developer or an owner building in Pennsylvania, that means a design decision made during construction documents can carry a revenue line for years after occupancy.

    How the savings are measured

    The Technical Reference Manual sets one baseline hierarchy, used across every program the Commission administers. For new construction and for equipment replaced at the end of its life, the baseline is the applicable code or national standard. For a discretionary retrofit, the baseline is the equipment already installed. The full hierarchy, and why the baseline a project is assigned changes the savings number, is set out in how AEC savings are calculated for retrofits and new construction.

    So a new building’s savings are the difference between the systems as designed and a code-minimum version of the same building. In Pennsylvania that code is set by the Uniform Construction Code, and which edition applies depends on when the building permit was applied for: - Permit applications before 1 January 2026 — the 2018 International Energy Conservation Code. - Permit applications on or after 1 January 2026 — the 2021 IECC, unless an executed design or construction contract predates that date.

    A project stays on the code in force when its permit was applied for, for the life of the project. ASHRAE Standard 90.1 enters as the commercial alternative compliance path under the IECC; the referenced edition should be confirmed for each project.

    That permit date is worth knowing before anything else. A higher code baseline is a harder target to beat, so a building permitted under the 2018 code starts from a lower bar than an identical building permitted after the switch — and because the code locks at permit, that advantage does not expire.

    Which systems actually produce credits

    Not every efficient choice in a new building produces meaningful credit volume, and it is worth being direct about which do.

    Lighting rarely carries a project on its own. Current code already sets lighting power densities at LED levels. A code-compliant new building is already a good lighting building, so the margin above baseline is narrow.

    Mechanical systems are where the volume is. Code minimum for heating and cooling is a standard-efficiency packaged unit or boiler. A design that instead uses ground-source or water-source heat pumps, variable refrigerant flow, a high-efficiency chiller plant, or dedicated outdoor air with energy recovery clears that baseline by a wide margin — and does so across the building’s whole annual load, not a fraction of it.

    The practical screen: the bigger the gap between what the code would have permitted and what the design actually specifies, the better the project. Buildings pursuing LEED, Passive House, or an owner’s own above-code standard are usually the strongest candidates, because the margin is already designed in.

    When to file, and what filing buys

    Credits run from the date a complete application is filed with the program administrator, forward across the measure’s remaining life under the Technical Reference Manual. They do not run backward. A building completed last year can still be filed — completion does not disqualify a project — but the months between occupancy and filing do not generate anything.

    The consequence for a project team is simple. The design work that creates the credits happens in construction documents. The filing that captures them should not wait until someone remembers two years into operations.

    What the application needs

    The program administrator evaluates energy efficiency projects case by case, using the savings calculations in the Commission’s Technical Reference Manual. An application identifies the TRM measure, sub-measure and technology, the claimed annual savings, and the measure vintage — new construction among them — and is supported by a savings schedule or measurement and verification report, invoices, and equipment documentation.

    Most of that already exists on a well-run project. The energy model built for code compliance, the submittals, and the commissioning report between them contain nearly everything the application asks for. The work is assembling it in the form the administrator reads, and filing it.

    An honest word on where this stands

    Pennsylvania’s Technical Reference Manual contains full new construction protocols, the manual serves the Alternative Energy Portfolio Standards Act by its own terms, and the application system is built on the manual’s own measure categories — new construction included. Nothing in the Act, the regulations or the published program guidance excludes new construction.

    What does not exist is a published ruling that says so in as many words, or a public record of a new construction project that has been certified. The program administrator’s own published savings formula is written for retrofits, and energy efficiency has historically been a very small share of Tier II credits — which is less a judgment about eligibility than a reflection of a credit market that was worth almost nothing until recently.

    Emergent Energy takes new construction projects on that basis: the path is the manual’s, the mechanics are the same ones that register every other efficiency project in the state, and the question of precedent is one worth settling in writing with the administrator before a project is modeled on the revenue. Any firm telling a developer this is settled is telling them something nobody can currently show them.

    Talk to us before the drawings are final

    The credits are created by design decisions and captured by a filing. Both are easier to get right early. Emergent Energy works with developers, owners and MEP teams in Pennsylvania to identify which systems in a planned building will clear the code baseline by enough to matter, and to register the completed project.

    Start here: https://pasrecs.com Questions on a planned building: sales@emergentenergy.us