    Can a Completed Efficiency Project Earn Tier II AECs?

    By Emergent Energy

    Nov 22, 20268 min read
    Share

    Often, yes. An LED retrofit, HVAC replacement or drive installation finished several years ago can still be certified for Pennsylvania Tier II AECs, as long as it is still operating and its savings can be verified. What it cannot do is earn credits for the years before it was certified. Most of the confusion about completed projects comes from blurring those two statements.

    Eligibility and issuance are separate questions

    Eligibility asks whether a project can be certified. Issuance asks which months produce credits.

    Under 52 Pa. Code § 75.63(i), credit issuance begins on the day the AEPS program administrator receives a complete application with a meter reading attached. Nothing is created before that date, and nothing builds up while a project waits. A building that saves electricity is not quietly generating AECs in the background; until the project is qualified and registered in PJM-GATS, there is nothing to sell. The no back-dating explainer covers the rule in more detail.

    Four checks for a completed project

    1. The equipment is still installed and working. Savings are verified against what is in the building today. Fixtures that have been replaced or drives that have been bypassed cannot be counted.

    2. The measure has approved life left. Each measure earns for its life in the 2026 PA Technical Reference Manual, counted from installation, so an older project files into whatever years remain. An LED retrofit installed in mid-2021 carries a 15-year life and has roughly 10 years left when filed in mid-2026. An HVAC tune-up from 2023 has a 3-year life and has run out. Lives for other measures are in the measure life reference.

    3. The savings can be documented. Invoices, equipment specifications, before-and-after fixture or equipment counts, operating hours and utility bills are the usual evidence. A utility rebate application and approval often contain most of it already (see using rebate paperwork for a PennAEPS application). Larger projects must be metered: from 750,000 kWh a year for lighting and 250,000 kWh a year for HVAC, motors and drives.

    4. The credit rights are clear. Rebate program terms, performance contracts, energy services agreements and equipment leases can assign environmental attributes to another party. The contracts are read before the application is filed, not after.

    What waiting costs

    Because issuance runs forward from the filing date and stops when the measure's life ends, each month a qualifying project sits unfiled is a month of credits it will never earn. For a project conserving 300 MWh a year, that is about 25 AECs a month — roughly $673 at the 2025 reporting-year weighted average of $26.92. Nothing is forfeited, because nothing was issued, but the earning window gets shorter.

    Before you accept an offer for your credits

    Some companies offer to buy a facility's Tier II AECs directly while they evaluate the project. That can be convenient. It also means the party setting the price is the party buying. Six questions are worth putting to any buyer, broker or aggregator, Emergent Energy Solutions included:

    1. What is the price per AEC, and is it fixed for the term or tied to the market?

    2. What comes out before you are paid — certification, GATS account fees, reporting, commission?

    3. How long is the commitment, and does it cover every credit the project produces?

    4. Whose name are the AEPS certification and the GATS account in, and can you move them if you change buyers?

    5. Who handles the monthly or quarterly savings reports and the annual attestation?

    6. Is this one bid or several? Tier II AECs are bought by every electric distribution company and electric generation supplier serving Pennsylvania customers, so a single buyer's offer is one price among many.

    For a benchmark, Tier II credits averaged $26.92 weighted and $36.43 spot in the PUC's figures for reporting year 2025; current indications are on the market prices page. The ways credits are sold are compared in broker vs. aggregator vs. going direct.

    Find out what a past project is worth

    Send Emergent Energy Solutions the project year, measures, rebate paperwork if there is any, and the facility's location. Emergent will say whether it can be certified, how many years of credits remain, and what they would be worth.

    Frequently asked questions

    Can a project finished several years ago earn Pennsylvania Tier II AECs?

    Often, yes, if the equipment is still installed and operating, the measure has approved life remaining under the PA Technical Reference Manual, the savings can be documented, and the credit rights have not been assigned to someone else.

    Do I get credits for the savings before I applied?

    No. Under 52 Pa. Code § 75.63(i), credits begin on the filing date of a complete application that includes a meter reading. Savings from earlier months do not produce credits.

    How long does the program administrator take to decide?

    The administrator must give written notice of its decision no later than 30 days after a complete application arrives (52 Pa. Code § 75.64).

    Does a utility rebate stop me from earning Tier II AECs on the same project?

    Not by itself. Rebate paperwork is often the strongest evidence of the savings. The rebate program's terms should be read first, because some programs address who holds the environmental attributes.