Eligibility

    Which Facilities Qualify for Tier II AECs in Pennsylvania?

    By Emergent Energy

    Nov 22, 20268 min read
    Share

    Hospitals, universities, retail chains, factories and warehouses all earn Pennsylvania Tier II AECs. None of them qualifies because of what kind of building it is. Qualification attaches to a project: a measure at a Pennsylvania facility that conserves or generates electricity in a way the AEPS program can verify. The building type mostly tells you how big a qualifying project is likely to be.

    The four tests every project has to pass

    • 1. It is in Pennsylvania. Act 114 of 2020 limited Tier II compliance to credits from facilities physically located in the state, so a multi-state portfolio can only certify its Pennsylvania sites.
    • 2. It is a Tier II resource. For most facilities that means demand-side management — measures that cut electricity use — or on-site generation such as combined heat and power. Solar is a Tier I resource and is certified separately (see Tier I vs. Tier II).

    3. The savings can be verified. Under 52 Pa. Code § 75.62(e), a facility must demonstrate that it conserves or generates electricity through a qualifying source. Efficiency savings are quantified with the PA Technical Reference Manual, either by its calculation method or by metering. Larger projects must be metered: from 750,000 kWh a year for lighting, and from 250,000 kWh a year for HVAC, motors and drives, and building shell work.

    4. There is life left and the rights are clear. Each measure earns only for its approved life, and only the party holding the credit rights can certify them. Rebate program terms, performance contracts, energy services agreements and leases can assign environmental attributes, so the contracts are read before anything is filed.

    What qualifies, facility by facility

    FacilityMeasures that commonly qualifyWhat drives credit volume
    Hospitals and health systemsCHP, chillers and air handling, LED lighting, drives on fans and pumpsRound-the-clock operation multiplies every kilowatt saved
    Colleges, universities and school districtsLED lighting, HVAC and controls, central plant upgrades, CHPMany buildings under one owner; academic calendars cut hours in some of them
    Retail chains and multi-site businessesLED lighting, refrigerated display cases, rooftop unitsSavings per store are modest, so pooling sites matters
    Manufacturing plantsCompressed air, drives and premium motors, lightingLong shifts and large motor loads
    Warehouses and distribution centersHigh-bay LED with controls, large ceiling fansLighting is most of the electric load
    Office buildingsLED lighting, HVAC replacement, controls, envelopeShorter occupied hours, so moderate savings per square foot
    Water and wastewater utilitiesDrives on pumps and blowers, CHP on digester gasContinuous pumping and aeration
    Houses of worship and nonprofitsLED lighting, HVAC replacementSmall volumes, usually combined with other projects

    Facility-specific guides go further: hospitals and health systems, schools and universities, manufacturing plants, a warehouse model and an office park model. Digester-gas CHP at a treatment plant raises its own classification question, covered in Tier I or Tier II for digester gas.

    What does not decide eligibility

    • Sector or building type. A hospital with no qualifying project earns nothing; a church with an LED retrofit can.
    • Green building certification. LEED and similar ratings are not AEPS criteria. A certified building still needs a specific measure with savings calculated or metered against the TRM baseline.
    • Running around the clock. Long hours raise the volume of a qualifying project. They do not make a project qualify.
    • Having taken a utility rebate. A rebate does not disqualify a project, though its terms should be checked for any assignment of credits (see rebates and Tier II AECs on the same project).
    • Age alone. An older project can still be certified if the measure has approved life remaining. See completed projects and Tier II AECs.

    Measure life matters as much as facility type

    Two facilities with the same savings can earn very different totals because their measures carry different approved lives in the 2026 TRM. An LED retrofit earns for 15 years, an electric chiller for 20, lighting controls for 8 and an HVAC tune-up for 3. The measure life reference lists the rest.

    Small sites

    A single small building can be certified, but every project carries the same steps: qualification, registration in PJM-GATS, periodic savings reports and the annual attestation. That fixed effort is why small sites under one owner, or several owners, are commonly aggregated.

    Check a facility

    Send Emergent Energy Solutions a list of the projects completed or planned at a Pennsylvania facility, and Emergent will say which ones qualify, which measures carry the most life, and what the credits would be worth.

    Frequently asked questions

    Do hospitals qualify for Pennsylvania Tier II AECs?

    A hospital qualifies through its projects, not its sector. Combined heat and power, chiller and air-handling upgrades, LED lighting and drives at a Pennsylvania hospital can be certified when the savings or generation can be verified and the credits have not been assigned to someone else.

    Does LEED certification make a building eligible for Tier II AECs?

    No. LEED and similar certifications are not part of AEPS qualification. A certified building still needs a specific measure whose electricity savings are calculated or metered against the Technical Reference Manual baseline.

    Can a retail chain combine its stores into one Tier II AEC project?

    Each site's measures are documented on their own, but small sites are commonly aggregated so that certification, reporting and sales are handled together rather than store by store.

    Is solar a Tier II resource in Pennsylvania?

    No. Solar photovoltaic is a Tier I resource and earns Tier I credits. Tier II covers resources such as demand-side management, distributed generation including smaller CHP, large-scale hydropower, waste coal and municipal solid waste.

    Ready to Monetize Your Energy Efficiency Projects?

    Send Emergent your project details for an assessment of the Tier II AECs it could earn.

    Start My Evaluation